M25, London - Carbon Neutral

Search our document section below where you will find IKO Products Brochures, Technical Data Sheets, BIM files, BBA certification, TDS documents and Case Studies showing full details of IKO installations. 

For DECLARATION OF PERFORMANCE DOCUMENTS please visit ikodop.eu.

Please contact us if you require any further assistance or product information. 

Filename M25 IKO Permatrack.pdf
Filesize 952.10 KB
Version 1 Previous versions
Date added January 9, 2019
Downloaded 4858 times
Category Highways & Civils, Bridge Expansion Joints – Highways & Civils, Road Surface Patch Repairs – Highways & Civils, Ironworks Reinstatement – Highways & Civils, Inlaid Crack Repair – Highways & Civils, Case Studies
Tags IKO Permatrack

Project Description

343 Tonnes of IKO Permatrack Repairs the London Orbital Motorway
Connect Plus (client) required a long term solution for their road repair project as the aforementioned road surface was already failing.

The repairs covered some of the most critical parts of the Motorway (M25) including elevated structures such as the section linking the M25 to the M1. A Mastic Asphalt solution (Namely the IKO Permatrack System) was chosen due to its CarbonZero (environmental credentials), durability, speed of installation and long-term life-span.

All IKO Permatrack Road Surfacing Repair Systems are a technically advanced, polymer modified asphalt, comprising of a flexible waterproofing layer and a high modulus surface course, covered by a BBA HAPAS certificate 02/H072. This made it the ideal solution to repairing the badly rutted and potholing carriageway surfacing of the M25.

IKO Permatrack installation was carried out by Techjoint Ltd to an excellent standard and the project was completed successfully on time and to the client’s (Connect Plus) satisfaction with IKO Permatrack now a regularly chosen system for other emergency road surfacing repairs.

Mohammed Jaja, Construction Manager for Connect Plus stated ‘We previously specified IKO Permatrack materials and found them to be the perfect solution for inlaid crack repair for numerous bridge joints and crack repairs, so it was the obvious ‘go-to’ system. The fact that all the carbon produced, from manufacture to installation, can be offset is not just great from an environmental point of view, but it is ethically the right thing to do’.