Search our document section below where you will find IKO Products Brochures, Technical Data Sheets, BIM files, BBA certification, TDS documents and Case Studies showing full details of IKO installations.
For DECLARATION OF PERFORMANCE DOCUMENTS please visit ikodop.eu.
Please contact us if you require any further assistance or product information.
| Filename | Airbus, Stevenage - Case Study.pdf |
| Filesize | 1,001.35 KB |
| Version | 1 Previous versions |
| Date added | December 18, 2017 |
| Downloaded | 2894 times |
| Category | Roofing, Bituminous Membrane – Roofing, Cold Applied Liquid – Roofing, Case Studies |
| Tags | IKO Mach One |
22,000m² Flame-Free System Used in Sensitive Industrial Refurbishment
Project Description
Airbus PLC required a completely flame-free installed system. Improvement was necessary to improve roof and gutter surface water clearance. The head office provided a challenge due to the amount of roof mounted pipework. Due to the housing of sensitive contents – vibration and noise as well as disruption had to be kept at a minimum.
Solution and Installation
No timber was allowed as part of the new refurb to conform to FM Global (Airbus Insurers) regarding system fire rating. IKO recommended an overlay on the existing deck, which complied with all the latest British Standards and Regulations.
IKO Mach One System was chosen as it provided a flame-free System. Where detailing was difficult IKO Polimar EC/UV System was used. The roof refurbishment also included the installation of smoke vents, associated smoke control panels and accessories.
Systems Used:
- IKO Systems Self-Adhesive Vapour Control Layer
- IKOpro Sprayfast PU Adhesive
- IKO Enertherm Insulation
- IKO Systems Self-Adhesive Underlay
- IKO Mach One Membrane
- IKO Polimar EC/UV System
Contractor: BAS Property Consultants
Size: 22,000m²

.
.